General Building Maintenance in 2020

The drains and toilets have been problematic and costly- £1270
The paving that runs alongside the centre has been relayed, levelled with additional new paving added. The steps and the coping stones have also been re-cemented
The outside of the building has been repainted.
The sports hall, meeting room and all the doors have been painted also

Posted by:

Share: